PROJECT

MSD Biotech – KCDM Project

LOCATION
Drynam Road, Swords, Co.Dublin

PROJECT SUMMARY
Controlled demolition, groundworks and concrete works for upgrade and extension of existing 220V ESB substation in a live pharmaceutical plant

MAIN CONTRACTOR
ADCO Contracting & Civils Ltd on behalf of MSD Ireland (Merck Sharpe Dohme)

Main Contractor:

Services:

Controlled Demolition | Groundworks | Concrete Works | Drainage and Services | Roads and Car Parks

Design Team:

Architect: PM Group

Engineer: PM Group

Key Features:

Vacuum excavation to expose existing live services around substation and install new ducting installation for substation upgrade

Controlled demolition of existing RC walls, floors and plinths using electric wall saws and robotic Brokk excavators with concrete munchers

Excavation and reinforced concrete works for new substation foundations, reinforced concrete ESB ducts, floor slab and concrete roof slab to newly extended live substation

Install new underground ducting for new increased ESB power supply cables to pharmaceutical plant

Completion of all finishes works including kerbs, concrete footpaths and tarmac roads

Programme: 16 weeks