PROJECT

Horizon Logistics Park Unit D9

LOCATION
Horizon Logistics Park, Harristown, Swords, Co Dublin

PROJECT SUMMARY
Site development and ground works for 9,200 sq m steel frame logistics warehouse with 2,000 sq m office area, including 16nr dock levellers, large concrete service yard and 147nr carpark spaces

CLIENT
Mac Group on behalf of Green Properties Ltd.

Main Contractor:

Services:

Earthworks | Substructures | Site Development | Roads | Paths & Paving

Design Team:

Architect: JSA Architects

Engineer: Clifton Scannell Emerson

Key Features:

Concrete poured to warehouse & office foundations (750m3) with mesh reinforcement (3,500m2) and holding down bolts set in place

Install foul & surface water drainage 100mm-750mm diameter up to 3m deep with 27nr manholes, Rainwater Harvesting Tank & Petrol Interceptors
(1,245m)

Install 160mm diameter PE SDR17 electrofusion watermain, valves & fittings (821m)

Install ducting with 20nr access chambers for MV, LV, ELV & site lighting (2km)

Prepare ground, kerbs and hardcore for concrete service yard (4,645m2)

Prepare ground, kerbs, hardcore, concrete footpaths, block paving & topsoil for 147nr car parking spaces

Programme: 46 weeks